TY - JOUR AB - In September 2010 Suresh Krishna, vice president of operations and integration at Polaris Industries Inc., a manufacturer of all-terrain vehicles, Side-by-Sides, and snowmobiles, needed to recommend a location for a new plant to manufacture the company's Side-by-Side vehicles.The economic slowdown in the United States had put considerable pressure on Polaris's profits, so the company was considering whether it should follow the lead of other manufacturers and open a facility in a country with lower labor costs. China and Mexico were shortlisted as possible locations for the new factory, which would be the first Polaris manufacturing facility located outside the Midwestern United States. By the end of the year Krishna needed to recommend to the board whether Polaris should build a new plant abroad (near-shored in Mexico or off-shored in China) or continue to manufacture in its American facilities.Evaluate tradeoffs between different geographic locations when establishing a manufacturing facility (off-shoring, near-shoring, and on-shoring)Run a sensitivity analysis on total costAssess the impact of transportation costs, exchange rates, labor cost rates, lead times, and other assumptions on total costsIdentify qualitative factors to be considered when deciding between non-U.S. facility locations, transportation time variability, consumer perceptions, and cultural differences VL - IS - SN - 2474-6568 DO - 10.1108/case.kellogg.2016.000260 UR - https://doi.org/10.1108/case.kellogg.2016.000260 AU - Chopra Sunil AU - Andreas Ioana AU - Gee Sigmund AU - Kolasi Ivi AU - Lhoste Stephane AU - Neuwirth Benjamin PY - 2017 Y1 - 2017/01/01 TI - Polaris Industries Inc. T2 - Kellogg School of Management Cases PB - Kellogg School of Management SP - 1 EP - 9 Y2 - 2024/04/24 ER -