To read this content please select one of the options below:

Strategies for integrating design and construction and operations and maintenance supply chains in Singapore

Florence Y.Y. Ling (Department of Building, National University of Singapore, Singapore)
Benjamin G.Y. Toh (Department of Building, National University of Singapore, Singapore)
Mohan Kumaraswamy (Department of Civil Engineering, The Hong Kong University, Hong Kong)
Kelwin Wong (Department of Civil Engineering, The Hong Kong University, Hong Kong)

Structural Survey

ISSN: 0263-080X

Article publication date: 6 May 2014

1059

Abstract

Purpose

The purpose of this paper is to investigates strategies for achieving better integration between the design and construction (DC) and operation and maintenance (OM) supply chains in Singapore. The specific objectives are to: discover the goals that stakeholders want to achieve in integrating the supply chains; identify the stakeholders that play important integration role in each supply chain; and investigate the effective strategies that may yield better integration of the supply chains.

Design/methodology/approach

Data were collected using a structured questionnaire. The sampling frame was Singapore-based clients, consultants and construction firms involved in developing and managing built facilities.

Findings

The most important strategies for integrating the supply chains are: sharing relevant information and addressing sustainability issues jointly with DC and OM teams; and integrating life cycle optimization options in DC and OM supply chains.

Research limitations/implications

The limitations include low response rate, and the subjective nature of a Likert scale which was used to rate importance levels. The research implication is that activities in DC and OM supply chains can indeed be integrated, and this leads to higher value for all stakeholders.

Practical implications

The practical implication is that stakeholders could adopt the effective strategies identified by this study to foster closer integration of the two supply chains in Singapore. Teams from both supply chains need to work jointly instead of consecutively. Sharing information through an online platform by setting up a web-based database may help in their collaboration. It is also important that common goals need be set out at the onset, preferably by clients of built facilities, with strong buy-in by main contractors and consultants, so as to achieve better value.

Originality/value

The study revealed effective strategies for integrating DC and OM supply chains.

Keywords

Acknowledgements

HKRGC GRF Grant HKU713209 and HKU Grant 201011159164 are acknowledged for their valued support in initiating the base research exercises.

Citation

Y.Y. Ling, F., G.Y. Toh, B., Kumaraswamy, M. and Wong, K. (2014), "Strategies for integrating design and construction and operations and maintenance supply chains in Singapore", Structural Survey, Vol. 32 No. 2, pp. 158-182. https://doi.org/10.1108/SS-02-2013-0015

Publisher

:

Emerald Group Publishing Limited

Copyright © 2014, Emerald Group Publishing Limited

Related articles