Books and journals Case studies Expert Briefings Open Access
Advanced search

Assessing the Design of Control Charts for Intermittent Data

Matthew Lindsey
Robert Pavur

Advances in Business and Management Forecasting

ISBN: 978-1-78743-070-9, eISBN: 978-1-78743-069-3

ISSN: 1477-4070

Publication date: 26 October 2017

Abstract

Control charts are designed to be effective in detecting a shift in the distribution of a process. Typically, these charts assume that the data for these processes follow an approximately normal distribution or some known distribution. However, if a data-generating process has a large proportion of zeros, that is, the data is intermittent, then traditional control charts may not adequately monitor these processes. The purpose of this study is to examine proposed control chart methods designed for monitoring a process with intermittent data to determine if they have a sufficiently small percentage of false out-of-control signals. Forecasting techniques for slow-moving/intermittent product demand have been extensively explored as intermittent data is common to operational management applications (Syntetos & Boylan, 2001, 2005, 2011; Willemain, Smart, & Schwarz, 2004). Extensions and modifications of traditional forecasting models have been proposed to model intermittent or slow-moving demand, including the associated trends, correlated demand, seasonality and other characteristics (Altay, Litteral, & Rudisill, 2012). Croston’s (1972) method and its adaptations have been among the principal procedures used in these applications. This paper proposes adapting Croston’s methodology to design control charts, similar to Exponentially Weighted Moving Average (EWMA) control charts, to be effective in monitoring processes with intermittent data. A simulation study is conducted to assess the performance of these proposed control charts by evaluating their Average Run Lengths (ARLs), or equivalently, their percent of false positive signals.

Keywords

  • Croston’s method
  • Forecasting
  • Slow-moving inventory
  • Control chart

Citation

Lindsey, M. and Pavur, R. (2017), "Assessing the Design of Control Charts for Intermittent Data", Advances in Business and Management Forecasting (Advances in Business and Management Forecasting, Vol. 12), Emerald Publishing Limited, pp. 121-135. https://doi.org/10.1108/S1477-407020170000012008

Download as .RIS

Publisher

:

Emerald Publishing Limited

Copyright © 2018 Emerald Publishing Limited

Please note you do not have access to teaching notes

You may be able to access teaching notes by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2021 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication sitemap

Policies and information

  • Privacy notice
  • Site policies
  • Modern Slavery Act Opens in new window
  • Chair of Trustees governance statement Opens in new window
  • COVID-19 policy Opens in new window
Manage cookies

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald Engage?

    You can join in the discussion by joining the community or logging in here.
    You can also find out more about Emerald Engage.

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Questions & More Information

    Answers to the most commonly asked questions here