To read this content please select one of the options below:

A cost-effectiveness assessment model using grey correlation analysis for power transformer selection based on life cycle cost

Yiyi Zhang (State Key Laboratory of Power Transmission Equipment and System Security and New Technology, Chongqing University, Chongqing, China)
Ruijin Liao (State Key Laboratory of Power Transmission Equipment and System Security and New Technology, Chongqing University, Chongqing, China)
Lijun Yang (State Key Laboratory of Power Transmission Equipment and System Security and New Technology, Chongqing University, Chongqing, China)
Xiaopin Deng (State Grid Electric Power Research Institute, Wuhan, China)
Huanchao Cheng (China Electric Power Research Institute, Beijing, China)
Cheng Lv (State Key Laboratory of Power Transmission Equipment and System Security and New Technology, Chongqing University, Chongqing, China)

Kybernetes

ISSN: 0368-492X

Article publication date: 28 January 2014

519

Abstract

Purpose

Statistics show that selecting the best investment program based on both cost and effectiveness can avoid financial losses. However, investment evaluation of a power transformer is full of uncertainty as it is hard to obtain accurate and useful cost-effectiveness results. Therefore, the purpose of the paper is to establish an investment evaluation model.

Design/methodology/approach

The cost-effectiveness evaluation model in this study used grey correlation analysis for the power transformer selection based on life cycle cost (LCC). Indices of cost and effectiveness factors were chosen to form a three-level index system including quantitative and qualitative factors. Evidential reasoning was applied to quantify the qualitative indexes. Grey correlation analysis was applied to select the best investment program.

Findings

The results from this study show that the proposed approach is effective and offers a new approach to evaluating transformer investment.

Practical implications

The model was applied to an investing decision-making problem of the transformer in a new substation in Wuhan, China.

Originality/value

It is very important to select the best transformer program in the candidate investment programs because the investment program decides almost 70 percent of the LCC of the power transformer.

Keywords

Acknowledgements

The authors acknowledge Professor Stanislaw Grzybowski of Mississippi State University for his useful advices. The authors also acknowledge the editor and the referees' accurate and valuable comments on the manuscript. This project is financially supported by the Fundamental Research Funds for the Central Universities (CDJZR12110018) and the National Natural Science Foundation of China (51277187).

Citation

Zhang, Y., Liao, R., Yang, L., Deng, X., Cheng, H. and Lv, C. (2014), "A cost-effectiveness assessment model using grey correlation analysis for power transformer selection based on life cycle cost", Kybernetes, Vol. 43 No. 1, pp. 5-23. https://doi.org/10.1108/K-07-2013-0160

Publisher

:

Emerald Group Publishing Limited

Copyright © 2014, Emerald Group Publishing Limited

Related articles