Maintenance backlog for improving integrated planning
Abstract
Purpose
The purpose of this paper is to develop a novel model for maintenance backlog (MB) of physical assets and structure it in a framework for integrated planning (IPL).
Design/methodology/approach
Reliability theory principles for modelling MB are used. Furthermore, to structure a framework for IPL, literature study combined with earlier case studies is used.
Findings
The framework for IPL facilitates the model of MB. In addition to providing real-time diagnosis indicators, MB is regarded as valuable information for decision support in IPL.
Originality/value
Development of MB applied to IPL.
Keywords
Citation
Rødseth, H. and Schjølberg, P. (2017), "Maintenance backlog for improving integrated planning", Journal of Quality in Maintenance Engineering, Vol. 23 No. 2, pp. 195-225. https://doi.org/10.1108/JQME-01-2016-0002
Publisher
:Emerald Publishing Limited
Copyright © 2017, Emerald Publishing Limited