To read this content please select one of the options below:

Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry

Ernest Kissi (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Theophilus Adjei-Kumi (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Samuel Twum-Ampofo (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Caleb Debrah (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)

Journal of Public Procurement

ISSN: 1535-0118

Article publication date: 27 April 2020

Issue publication date: 17 July 2020

709

Abstract

Purpose

The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry.

Design/methodology/approach

From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry.

Findings

A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings.

Social implications

The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability.

Originality/value

This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.

Keywords

Citation

Kissi, E., Adjei-Kumi, T., Twum-Ampofo, S. and Debrah, C. (2020), "Identifying the latent shortcomings in achieving value for money within the Ghanaian construction industry", Journal of Public Procurement, Vol. 20 No. 3, pp. 313-330. https://doi.org/10.1108/JOPP-11-2019-0075

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Related articles