To read this content please select one of the options below:

Application of data mining for spare parts information in maintenance schedule: a case study

U.C. Moharana (Department of Industrial and Systems Engineering, Indian Institute of Technology Kharagpur, Kharagpur, India)
S.P. Sarmah (Department of Industrial and Systems Engineering, Indian Institute of Technology Kharagpur, Kharagpur, India)
Pradeep Kumar Rathore (Department of Industrial and Systems Engineering, Indian Institute of Technology Kharagpur, Kharagpur, India)

Journal of Manufacturing Technology Management

ISSN: 1741-038X

Article publication date: 6 August 2019

570

Abstract

Purpose

The purpose of this paper is to suggest a framework for extracting the sequential patterns of maintenance activities and related spare parts information from historical records of maintenance data with pre-defined support or threshold values.

Design/methodology/approach

A data mining approach has been adopted for predicting the maintenance activity along with spare parts. It starts with a collection of spare parts and maintenance data, and then the development of sequential patterns followed by formation of frequent spare part groups, and finally, integration of sequential maintenance activities with the associated spare parts.

Findings

This study suggests a framework for extracting the sequential patterns of maintenance activities from historical records of maintenance data with pre-defined support or threshold values. A rule-based approach is proposed in this paper to predict the occurrence of next maintenance activity along with the information of spare parts consumption for that maintenance activity.

Research limitations/implications

Presented model can be extended for analyzing the failure maintenance activities and performing root cause analysis that can give more valuable suggestion to maintenance managers to take corrective actions prior to next occurrence of failures. In addition, the timestamp information can be utilized to prioritize the maintenance activity that is ignored in this study.

Practical implications

The proposed model has a high potential for industrial applications and is validated through a case study. The study suggests that the model gives a better approach for selecting spare parts based on their similarity or correlation, considering their actual occurrence during maintenance activities. Apart from this, the clustering of spare parts also trains maintenance manager to learn about the dependency among the spares for group stocking and maintaining the parts availability during maintenance activities.

Originality/value

This study has used the technique of data mining to find dependent spare parts itemset from the database of the company and developed the model for associated spare parts requirement for subsequent maintenance activity.

Keywords

Citation

Moharana, U.C., Sarmah, S.P. and Rathore, P.K. (2019), "Application of data mining for spare parts information in maintenance schedule: a case study", Journal of Manufacturing Technology Management, Vol. 30 No. 7, pp. 1055-1072. https://doi.org/10.1108/JMTM-09-2018-0303

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles