To read this content please select one of the options below:

Designing an uncertain bi-objective green leagile capacitated lot sizing problem considering FM/M/C queue system

Masoud Rabbani (Department of College of Engineering, University of Tehran, Tehran, Iran)
Soroush Aghamohamadi Bosjin (Department of College of Engineering, University of Tehran, Tehran, Iran)
Neda Manavizadeh (Department of Industrial Engineering, Khatam University, Tehran, Iran)
Hamed Farrokhi-Asl (Department of School of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran)

Journal of Modelling in Management

ISSN: 1746-5664

Article publication date: 18 August 2021

Issue publication date: 29 November 2022

123

Abstract

Purpose

This paper aims to present a novel bi-objective mathematical model for a production-inventory system under uncertainty.

Design/methodology/approach

This paper addresses agile and lean manufacturing concepts alongside with green production methods to design an integrated capacitated lot sizing problem (CLSP). From a methodological perspective, the problem is solved in three phases. In the first step, an FM/M/C queuing system is used to minimize the number of customers waited to receive their orders. In the second step, an effective approach is applied to deal with the fuzzy bi-objective model and finally, a hybrid metaheuristic algorithm is used to solve the problem.

Findings

Some numerical test problems and sensitivity analyzes are conducted to measure the efficiency of the proposed model and the solution method. The results validate the model and the performance of the solution method compared to Gams results in small size test problems and prove the superiority of the hybrid algorithm in comparison with the other well-known metaheuristic algorithms in large size test problems.

Originality/value

This paper presents a novel bi-objective mathematical model for a CLSP under uncertainty. The proposed model is conducted on a practical case and several sensitivity analysis are conducted to assess the behavior of the model. Using a queue system, this problem aims to reduce the items waited in the queue to receive service. Two objective functions are considered to maximize the profit and minimize the negative environmental effects. In this regard, the second objective function aims to reduce the amount of emitted carbon.

Keywords

Acknowledgements

Authors would like thank to the University of Tehran for providing the situation for completion of this study.

Citation

Rabbani, M., Aghamohamadi Bosjin, S., Manavizadeh, N. and Farrokhi-Asl, H. (2022), "Designing an uncertain bi-objective green leagile capacitated lot sizing problem considering FM/M/C queue system", Journal of Modelling in Management, Vol. 17 No. 4, pp. 1292-1318. https://doi.org/10.1108/JM2-10-2018-0169

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited