TY - JOUR AB - Purpose The paper aims to study manpower dynamics at offshore and onsite location for maintenance project, which are transferred to offshore location in a phase-wise manner. The purpose of the paper is to find good values of onsite–offshore team strength, the number of hours of communication between onsite and offshore teams for smooth transfer of software maintenance project to offshore location.Design/methodology/approach This study uses system dynamics simulation approach to study manpower allocation at onsite and offshore locations to transfer the maintenance work to offshore location in a gradual manner. The authors consulted 13 experts from Indian software outsourcing industry during the model construction and validation.Findings The simulation results show that the complexity of maintenance project has an insignificant effect on offshore migration. The maintenance work transfer should start with initial onsite team strength higher than that of required for ticket solving and project. The initial offshore team strength should be based on training capacity available at the onsite location. The higher attrition rate at an offshore is detrimental for offshore migration.Research limitations/implications The implication of the study is in the development of a broad framework of software maintenance work transfer to offshore locations for Indian software outsourcing projects. As the study is based on expert opinion in the context of India, it cannot be generalized for outsourcing scenarios elsewhere.Practical implications The software project manager can use the findings to get more insight into maintenance project offshore migration and divide the software team between onsite and offshore location.Originality/value The study is novel as there is little attempt at finding the manpower composition at onsite and offshore locations for software maintenance project during the migration phase. VL - 12 IS - 1 SN - 2398-5364 DO - 10.1108/JGOSS-02-2018-0009 UR - https://doi.org/10.1108/JGOSS-02-2018-0009 AU - Mishra Debasisha AU - Mahanty Biswajit PY - 2019 Y1 - 2019/01/01 TI - Study of maintenance project manpower dynamics in Indian software outsourcing industry T2 - Journal of Global Operations and Strategic Sourcing PB - Emerald Publishing Limited SP - 62 EP - 81 Y2 - 2024/09/18 ER -