Improving safety performance through post occupancy evaluations (POE): A study of Malaysian low-cost housing

Husrul Nizam Husin (Department of Quantity Surveying, Universiti Teknologi MARA, Seri Iskandar, Malaysia)
Abdul Hadi Nawawi (Department of Estate Management, Universiti Teknologi MARA, Shah Alam, Malaysia)
Faridah Ismail (Department of Quantity Surveying, Universiti Teknologi MARA, Shah Alam, Malaysia)
Natasha Khalil (Department of Quantity Surveying, Universiti Teknologi MARA, Seri Iskandar, Malaysia)

Journal of Facilities Management

ISSN: 1472-5967

Publication date: 5 February 2018

Abstract

Purpose

There are rising issues with the delivery performance of Malaysian low-cost housing (LCH) because the occupants are inclined to perceive safety hazards. Among the safety issues raised during the occupancy period in LCH are structural instability and falling building fragments. Without defining the occupants’ requirements in the early housing development, it is hard to determine the prevailing safety factors. Hence, this paper emphasises the application of post occupancy evaluation (POE) that incorporates participation from the occupants as a tool to assess the safety performance of Malaysian LCH. The purpose of this study is to develop a framework of POE integrated with safety elements for Malaysian LCH.

Design/methodology/approach

This research was carried out with a quantitative method using questionnaires as the survey instrument involving safety inspection survey and satisfaction surveys. The inspection survey and Occupants’ Satisfaction Survey were carried out based on 24 LCH projects located in the federal territory of Kuala Lumpur, Malaysia. In total, 380 samples were used for both surveys. Statistical correlation was used to affirm the incorporation of occupants’ participation towards safety performance in the POE approach. The Spearman’s rho (r) correlation was used in the analysis for variables in both surveys which consisted of an ordinal scale.

Findings

The correlation result revealed that there was a significant relationship among all safety attributes between safety performance and occupants’ satisfaction. Therefore, a framework consisting of POE and safety elements has been proposed based on the significance of both variables. The development process of the framework used the vital phases of POE and inputs of safety elements which consisted of three main stages: planning phase as safety input, conducting phase as safety process and applying phase as safety output.

Research limitations/implications

The surveys were limited to the rented People’s Housing Programme located in Kuala Lumpur and not extensively to all LCH programmes in Malaysia. The surveys were also not carried out to other LCH programmes such as the Hardcore Poor Housing Programmes and the low- to medium-cost housing because of the limitations of time and resources.

Practical implications

This research has introduced a new dimension for safety performance assessment in LCH using the POE as the safety performance tool. By allowing the participation of occupants for safety assessment, this study stresses the fundamental concept of POE by highlighting the importance of obtaining feedback from the building occupants.

Originality/value

As a proactive measure, the proposed framework was introduced as an improved procedure to inspect safety performance in LCH during occupancy, in lieu of the current assessment process. Receiving complaints from the occupants after the occurrence of incidents is demarcated as a reactive approach, whereas the current inspection survey does not incorporate the occupants’ participation. Feedback from occupants is not a routine of building assessment during occupancy; hence, using POE is generally a new dimension of safety performance in Malaysian LCH.

Keywords

  • Correlation analysis
  • Post occupancy evaluation
  • Safety performance
  • Integrated framework
  • Low-cost housing
  • Occupants’ satisfaction

Acknowledgements

The authors wish to acknowledge the support grant in performing this study under the Exploratory Research Grant Scheme (ERGS) Phase 1/2011 funded by the Ministry of Higher Education Malaysia (MOHE) and also Universiti Teknologi MARA Cawangn Perak, Seri Iskandar, Malaysia.

Citation

Husin, H., Nawawi, A., Ismail, F. and Khalil, N. (2018), "Improving safety performance through post occupancy evaluations (POE): A study of Malaysian low-cost housing", Journal of Facilities Management, Vol. 16 No. 1, pp. 65-86. https://doi.org/10.1108/JFM-06-2017-0028

Download as .RIS

Publisher

:

Emerald Publishing Limited

Copyright © 2018, Emerald Publishing Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
Login
To rent this content from Deepdyve, please click the button.
Rent from Deepdyve
If you would like to contact us about accessing this content, click the button and fill out the form.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2019 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication Sitemap

Policies and information

  • Legal Opens in new window
  • Editorial policy Opens in new window & originality guidelines Opens in new window
  • Site policies
  • Modern Slavery Act Opens in new window

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald’s Library Advisory Network?

    You can start or join in a discussion here.
    If you’d like to know more about The Network, please email us

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Frequently Asked Questions

    Your questions answered here