TY - JOUR AB - Purpose This paper aims to evaluate Nigerian contractors’ perceptions regarding the effects of positive and negative cash flow during construction projects, with a view to establishing effective strategies for cash flow management.Design/methodology/approach A desktop-based literature review is used to develop a cross-sectional questionnaire survey which uses Likert items to elicit responses from construction professionals on: the reasons for cash flow problems; the impacts of negative and positive cash flow; and the potential solutions for improving cash flow on construction projects.Findings The study finds that delay in payments, difficulty in obtaining financial aid and inadequate budgetary control are the causes of cash flow problems during construction projects. Cumulatively, these issues result in project delays, reduced profit margins and in the worst scenarios, abandoned projects.Originality/value There has been limited research into the effects of positive and negative cash flows on construction projects in Nigeria and indeed, the wider geographical location of West Africa. This study addresses this observed dearth and consequently advances methods and solutions to deal with the problem of poor cash flow management in the Nigerian construction industry. VL - 18 IS - 2 SN - 1726-0531 DO - 10.1108/JEDT-04-2019-0099 UR - https://doi.org/10.1108/JEDT-04-2019-0099 AU - Omopariola Emmanuel Dele AU - Windapo Abimbola AU - Edwards David John AU - Thwala Wellington Didibhuku PY - 2019 Y1 - 2019/01/01 TI - Contractors’ perceptions of the effects of cash flow on construction projects T2 - Journal of Engineering, Design and Technology PB - Emerald Publishing Limited SP - 308 EP - 325 Y2 - 2024/04/19 ER -