Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors’ perspectives

Bismark Agyekum (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Ernest Kissi (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Daniel Yamoah Agyemang (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)
Edward Badu (Department of Construction Technology and Management, Kwame Nkrumah University of Science and Technology, Kumasi, Ghana)

Journal of Engineering, Design and Technology

ISSN: 1726-0531

Article publication date: 6 November 2018

Issue publication date: 27 November 2018

329

Abstract

Purpose

Cost estimation model serves as a framework for forecasting the probable cost of proposed construction projects. It can be classified either as traditional or non-traditional depending on the cost variables formulation. However, in the building industry, quantity surveyors traditionally estimate the initial cost of building projects using the traditional models, which have been criticized overtime for its inaccuracies. This paper therefore aims to examine barriers for the utilization of non-traditional cost estimating models.

Design/methodology/approach

By using a questionnaire survey, respondents were invited to rate their level of agreement on 23 barriers identified from literature and interview (expert’s opinion).

Findings

Based on factor analysis inefficient techniques, perceptions of model techniques, unavailability of cost data and lack of understanding and unstable economic conditions were identified as barriers to the utilization of non-traditional cost estimating models.

Practical/implications

Findings demonstrate that there is need for quantity surveyors to get adapted to utilization of non-traditional cost models which offers better accuracies than the traditional approaches in their quest to improve their professional practices.

Originality/value

This study demonstrates that there are barriers to the utilization of non-traditional cost estimating models in the Ghanaian construction industry, as evident of this will help in policy formulation for the improvement cost estimating practices.

Keywords

Citation

Agyekum, B., Kissi, E., Yamoah Agyemang, D. and Badu, E. (2018), "Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors’ perspectives", Journal of Engineering, Design and Technology, Vol. 16 No. 6, pp. 814-827. https://doi.org/10.1108/JEDT-02-2018-0021

Publisher

:

Emerald Publishing Limited

Copyright © 2018, Emerald Publishing Limited

Related articles