Books and journals Case studies Expert Briefings Open Access
Advanced search

Investigating the implementation of and accountability in PPPs: a case study in public water management

Jean Claude Mutiganda (School of Business and Economics, Åbo Akademi University, Turku, Finland) (Department of Accounting, University of Gävle, Gävle, Sweden)
Matti Skoog (School of Business and Economics, Åbo Akademi University, Turku, Finland)
Guiseppe Grossi (Nord University, Bodø, Norway)

Journal of Accounting in Emerging Economies

ISSN: 2042-1168

Publication date: 11 August 2020

Abstract

Purpose

This study analyses how the implementation of PPPs to operate rural water infrastructures and deliver water to local population has led to a new accountability archetype.

Design/methodology/approach

The archetype theory is used to analyse the process of implementing PPPs as a new archetype and setting up systems and structures of accountability between contracting parties. The empirical part of the study is based on extensive document analysis in an East African country. Documents analysed are from governmental sources, UNICEF and the World Bank and cover a period from 1998 to early 2019.

Findings

The process of implementing PPPs was revolutionary at the national level and evolutionary at micro levels. The sequence of the change process moved from central to peripheral. The linearity followed a reorientation track strategy. Setting up systems and structure of accountability was evolutionary, peripheral to central following the reorientation strategy. National authorities reacted proactively to comments and suggestions from international donors and local population. However, not all districts have fully implemented PPPs in their rural water sector. The structure of accountability at the local level, however, still suffers from logistical and professional capacity constraints.

Research limitations/implications

Empirical findings cannot be generalised to other situations, but the theoretical framework used in this study can be applied elsewhere.

Practical implications

Giving priority to hearing from end users themselves before designing and implementing policies that intend to respond to specific local needs is recommended.

Originality/value

This study explains the ways in which micro-organisational change can lead to revolutionary archetypes such as PPPs, whereas the implementation of systems and the structure of accountability at inter-organisational level remain evolutionary.

Keywords

  • Accountability
  • Archetype
  • Change
  • Evolutionary
  • Public private partnership
  • Revolutionary
  • Water
  • Africa

Citation

Mutiganda, J.C., Skoog, M. and Grossi, G. (2020), "Investigating the implementation of and accountability in PPPs: a case study in public water management", Journal of Accounting in Emerging Economies, Vol. 11 No. 1, pp. 122-146. https://doi.org/10.1108/JAEE-01-2019-0025

Download as .RIS

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Please note you do not have access to teaching notes

You may be able to access teaching notes by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
To rent this content from Deepdyve, please click the button.
Rent from Deepdyve
If you think you should have access to this content, click the button to contact our support team.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2021 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication sitemap

Policies and information

  • Privacy notice
  • Site policies
  • Modern Slavery Act Opens in new window
  • Chair of Trustees governance statement Opens in new window
  • COVID-19 policy Opens in new window
Manage cookies

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald Engage?

    You can join in the discussion by joining the community or logging in here.
    You can also find out more about Emerald Engage.

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Questions & More Information

    Answers to the most commonly asked questions here