An integrated approach for lead time reduction of military aircraft major overhaul: A case of ABC Company

J. Saravanan (Overhaul Division, Hindustan Aeronautics Limited, Bengaluru, India)
Jitesh J. Thakkar (Department of Industrial and Systems Engineering, Indian Institute of Technology Kharagpur, Kharagpur, India)

International Journal of Quality & Reliability Management

ISSN: 0265-671X

Article publication date: 2 January 2018

932

Abstract

Purpose

The purpose of this paper is to investigate into the improvement strategies for lead time reduction of military aircraft major overhaul (enhance the overhaul task from present seven to nine-plus aircrafts as agreed to customer) for ABC Company.

Design/methodology/approach

This research has been conducted based on the available knowledge and extensive experience gained while working in the overhaul unit of the case organization for a long period of time. The research employs an integrated approach of multi-criteria decision method (in specific analytic hierarchy process (AHP)), theory of constraint (TOC) and simulation for M/M/1/K queuing environment for investigating the improvement strategies for lead time reduction in major overhaul of military aircraft. This has mainly included: Step 1: analysis of existing activity network using actual overhaul data; Step 2: ranking of constraint activities that most affects the lead time using AHP; Step 3: revised flow activity network using time buffers (TBs) concept of TOC; Step 4: mathematical model formulation for effective utilization of TB using single server finite queuing approach (M/M/1/K queuing environment); Step 5: discrete event simulation representing present overhaul conditions and revised overhaul conditions with different scenarios; and Step 6: sensitivity analysis and interpretation of results. The proposed methodology has been tested on an industrial case study dealing with an aircraft overhaul in India (namely ABC Company).

Findings

The proposed overhaul lead-time reduction plan points out the augmentation of resources in order to achieve more than 50 per cent reduction in lead time and waiting time under two scenarios – with overtime and without overtime.

Research limitations/implications

An integrated approach proposed has so far been applicable to the specific aircrafts (Jaguar/Mirage/Kiran) of the ABC Company overhaul division. However, the particular methodology can be proved potentially useful and highly practical when applying to other aircraft types.

Originality/value

The results indicate several problems with the current overhaul strategies that need focused process improvements and a need for capacity augmentation for achieving the enhanced overhaul task of nine+ aircrafts per year with reduced overhaul lead time. The proposed approach also provides the maintenance planners with a platform for decision analysis and support often ignored the capacity augmentation.

Keywords

Citation

Saravanan, J. and Thakkar, J.J. (2018), "An integrated approach for lead time reduction of military aircraft major overhaul: A case of ABC Company", International Journal of Quality & Reliability Management, Vol. 35 No. 1, pp. 2-33. https://doi.org/10.1108/IJQRM-07-2015-0102

Publisher

:

Emerald Publishing Limited

Copyright © 2018, Emerald Publishing Limited

Related articles