Factors leading to design changes in Jordanian construction projects

Lina Ghazi Gharaibeh (Department of Civil Engineering, The University of Jordan, Amman, Jordan)
Sandra T. Matarneh (Department of Civil Engineering, Faculty of Engineering, Al-Ahliyaa Amman University, Amman, Jordan)
Mazen Arafeh (Department of Industrial Engineering, The University of Jordan, Amman, Jordan)
Ghaleb Sweis (Department of Civil Engineering, The University of Jordan, Amman, Jordan)

International Journal of Productivity and Performance Management

ISSN: 1741-0401

Article publication date: 27 May 2020

Issue publication date: 29 March 2021

581

Abstract

Purpose

The problem of design changes in the construction industry is common worldwide, and the Jordanian market is no exception. The purpose of this paper is to identify the factors causing design changes in construction projects in Jordan in both the public and private sectors. Furthermore, this research will examine the effect of these factors on project's performance during the construction phase.

Design/methodology/approach

This research commences by identifying the factors causing design changes in construction projects worldwide through an intensive literature review. The identified factors were then filtered to those applicable to the Jordanian construction market based on the results obtained from a questionnaire survey and real case construction projects. In total, 252 professionals from the Jordanian construction industry and 10 completed and/or ongoing construction projects in different parts of Jordan were compared.

Findings

The results find that the top major factors affecting design changes are owner's requirements; design errors and omissions and value engineering. The research also studies and documents the impacts of design changes on project cost, schedule and quality.

Originality/value

The results obtained from this research will assist the construction professionals representing owners, consultants and contractors in applying control measures to minimize the occurrence of the identified factors causing design changes and to mitigate their sever impacts on projects in terms of cost, schedule and quality.

Keywords

Citation

Gharaibeh, L.G., Matarneh, S.T., Arafeh, M. and Sweis, G. (2021), "Factors leading to design changes in Jordanian construction projects", International Journal of Productivity and Performance Management, Vol. 70 No. 4, pp. 893-915. https://doi.org/10.1108/IJPPM-08-2019-0412