Ranking the risk categories in international projects using the TOPSIS method

Rahul Dandage (Sardar Patel College of Engineering, Mumbai, India) (Rajendra Mane College of Engineering and Technology, Devrukh, India)
Shankar S. Mantha (Veermata Jijabai Technological Institute, Mumbai, India) (All India Council for Technical Education, New Delhi, India)
Santosh B. Rane (Department of Mechanical Engineering, Sardar Patel College of Engineering, Mumbai, India)

International Journal of Managing Projects in Business

ISSN: 1753-8378

Article publication date: 19 April 2018

Issue publication date: 2 May 2018

1362

Abstract

Purpose

The purpose of this paper is to review the risk categories which are predominant in international projects and to rank them according to their effect on project success.

Design/methodology/approach

A literature survey of peer-reviewed journal articles, survey reports and books on project management is used as the research methodology. One among the various multi-criteria decision making methods named as Technique for Order Preference by Similarity to the Ideal Solution (TOPSIS) has been used to rank the risk categories according to their importance. The data for TOPSIS were collected through questionnaire as the research instrument.

Findings

The findings derived from evaluation of the publications led to the identification of eight different types of risk categories associated with international projects. The TOPSIS method resulted into political risks, technical risks and design-related risks as the top three risk categories in international projects. Contractual and legal risks and fraudulent practices-related risks are relatively low-ranked risk category.

Research limitations/implications

The findings will be useful in successful implementation of international projects as the knowledge of risk categories and their ranking will help project manager to plan the risk response strategies. A larger sample size for decision makers and more variety of projects can give more exhaustive risk categories and their ranking.

Practical implications

This paper explores eight different risk categories in international projects. It represents the ranking of risk categories according to their importance in project success. This will be helpful to project managers for developing a general framework for planning the appropriate risk response strategies.

Social implications

Governments of many countries around the world are encouraging their industries to undertake and successfully complete projects in foreign countries. However, many industries experience failure in projects as they fail to implement the risk management (RM) effectively in international projects. This research work provides the risk categories in international projects and their ranking which can assist in developing strategies to respond the risk appropriately.

Originality/value

This paper uses the TOPSIS method for ranking major types of risk categories in international projects. It might represent new opportunities for rigorous and relevant research that would contribute to an in-depth knowledge of RM methodologies.

Keywords

Citation

Dandage, R., Mantha, S.S. and Rane, S.B. (2018), "Ranking the risk categories in international projects using the TOPSIS method", International Journal of Managing Projects in Business, Vol. 11 No. 2, pp. 317-331. https://doi.org/10.1108/IJMPB-06-2017-0070