To read this content please select one of the options below:

A fuzzy maturity-based method for lean supply chain management assessment

Gabriela Pereira Soares (Universidade Federal de Santa Catarina, Florianópolis, Brazil)
Guilherme Tortorella (Universidade Federal de Santa Catarina, Florianópolis, Brazil and The University of Melbourne, Melbourne, Australia)
Marina Bouzon (Universidade Federal de Santa Catarina, Florianópolis, Brazil)
Madjid Tavana (School of Business, La Salle University, Philadelphia, Pennsylvania, USA and Faculty of Business Administration and Economics, Paderborn University, Paderborn, Germany)

International Journal of Lean Six Sigma

ISSN: 2040-4166

Article publication date: 29 March 2021

Issue publication date: 21 October 2021

358

Abstract

Purpose

This study aims to propose a method for measuring lean supply chain management (LSCM) maturity based on the main lean practices and existing waste of a supply chain.

Design/methodology/approach

A three-stage approach was developed. First, a thorough literature review was performed to raise concepts and previous findings on maturity models (MMs) and LSCM. This review’s outcomes were then validated by experts in the field using the fuzzy Delphi method (FDM). Subsequently, the proposed model was illustrated and assessed based on a multi-case study.

Findings

All companies attained high outcomes in the elimination of the waste pillar. The pillars of logistics management, continuous improvement and information technology management also stood out in the three organizations’ results. The company with the lowest maturity level operates in a make-to-order production policy, which may harm the lean supply in its supply chain.

Practical implications

The proposed model can reveal external opportunities and threats and internal strengths and weaknesses in supply chains (SCs). It is also capable of providing a clear roadmap for SC improvement in companies.

Originality/value

To the best of the authors’ knowledge, no study to date has proposed a MM in the LSCM context using FDM and considering the crucial relationship between lean practices and wastes.

Keywords

Citation

Soares, G.P., Tortorella, G., Bouzon, M. and Tavana, M. (2021), "A fuzzy maturity-based method for lean supply chain management assessment", International Journal of Lean Six Sigma, Vol. 12 No. 5, pp. 1017-1045. https://doi.org/10.1108/IJLSS-08-2020-0123

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited

Related articles