To read this content please select one of the options below:

A comparison of three simulation methodologies for a Lean Six Sigma manufacturing project – a business case study

Ali Ahmed (Department of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney, Australia)
John Page (Department of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney, Australia)
John Olsen (Department of Mechanical and Manufacturing Engineering, University of New South Wales, Sydney, Australia)

International Journal of Lean Six Sigma

ISSN: 2040-4166

Article publication date: 14 June 2019

Issue publication date: 14 May 2020

824

Abstract

Purpose

This paper aims to compare the prognostic and visualisation capabilities of all the three simulation paradigms to identify their suitability and rigor in eliminating weaknesses and bottlenecks in a Lean Six Sigma (LSS) project.

Design/methodology/approach

The paper uses an light-emitting diode (LED) factory as a business case to show the differences and advantages of using three different simulation techniques to solve a manufacturing problem.

Findings

Even though this is only one business case that shows how system dynamics (SD) can be effective in a Six Sigma manufacturing project, more examples are needed to validate this hypothesis within Six Sigma and Lean manufacturing fields. Even though, discrete-events (DE) and agent-based (AB) models are both equally well suited to develop the manufacturing processes and the choice of what to use may be arbitrarily dependent on the available software or the preference of the modeller, hybrid models seem to become extremely powerful. Therefore, more hybrid models need to be constructed within LSS (especially when a flowchart and a SIPOC ((Suppliers, Inputs, Process, Outputs and Customers) table are combined to develop a hybrid model) to achieve the most accurate results with accurate representation of reality.

Originality/value

There are three commonly used simulation techniques, DE, AB and SD, but choosing the right simulation methodology has often been a challenge.

Keywords

Citation

Ahmed, A., Page, J. and Olsen, J. (2020), "A comparison of three simulation methodologies for a Lean Six Sigma manufacturing project – a business case study", International Journal of Lean Six Sigma, Vol. 11 No. 3, pp. 405-427. https://doi.org/10.1108/IJLSS-03-2018-0025

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles