To read this content please select one of the options below:

Understanding the low adoption of prefabrication prefinished volumetric construction (PPVC) among SMEs in Singapore: from a change management perspective

Gao Shang (Faculty of Architecture, Building and Planning, The University of Melbourne, Melbourne, Australia)
Low Sui Pheng (Department of Building, National University of Singapore, Singapore, Singapore)
Ong Le Tian Gina (Department of Building, National University of Singapore, Singapore, Singapore)

International Journal of Building Pathology and Adaptation

ISSN: 2398-4708

Article publication date: 16 December 2020

Issue publication date: 2 November 2021

5928

Abstract

Purpose

Construction productivity issues have constantly surfaced in Singapore's construction industry. To push for productivity, the Government has implemented various initiatives to encourage industry players, particularly small and medium enterprises (SMEs), and to adopt more productive construction technologies. One of these technologies is prefabrication prefinished volumetric construction (PPVC), a concept of the design for manufacturing and assembly (DfMA) approach. This exploratory study sheds lights on PPVC adoption and its issues in Singapore in the context of the launch of the Construction Industry Transformation Map (ITM).

Design/methodology/approach

The methodology used here is mainly a quantitative approach in the form of a survey. A questionnaire was developed and distributed to a pool of about 100 contractors, randomly chosen as part of a stratified sample. The questionnaire survey helps gain further insights into the industry's perceptions of PPVC and its adoption.

Findings

The study succeeded in identifying and analysing a list of drivers of and barriers to the adoption of PPVC. The top three most important potential drivers were “increase efficiency,” “technological change” and “changing nature of composition of workforce”. The three most important barriers were “ineffective on-site storage,” “high up-front payment” and “transportation issues”.

Originality/value

This study also looked into the organizational change management theory. Various theories were considered to help understand and implement change. It is understood that it is not only important for an organization to focus on the steps of these frameworks and models when the change is initiated but also for the organization to acknowledge and be mindful of the emotions of employees and take measures to overcome their emotions as part of organizational change management.

Keywords

Citation

Shang, G., Pheng, L.S. and Gina, O.L.T. (2021), "Understanding the low adoption of prefabrication prefinished volumetric construction (PPVC) among SMEs in Singapore: from a change management perspective", International Journal of Building Pathology and Adaptation, Vol. 39 No. 5, pp. 685-701. https://doi.org/10.1108/IJBPA-08-2020-0070

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Related articles