To read this content please select one of the options below:

Building information modelling to support maintenance management of healthcare built assets

Nadeeshani Wanigarathna (Department of Engineering and Built Environment, Anglia Ruskin University, Chelmsford, UK)
Keith Jones (Anglia Ruskin University, Chelmsford, UK)
Adrian Bell (Department of Engineering and Built Environment, Anglia Ruskin University, Chelmsford, UK)
Georgios Kapogiannis (Department of Architecture and Built Environment, University of Nottingham, Ningbo, Zhejiang, China)

Facilities

ISSN: 0263-2772

Article publication date: 13 February 2019

Issue publication date: 10 April 2019

1977

Abstract

Purpose

This paper aims to investigate how digital capabilities associated with building information modelling (BIM) can integrate a wide range of information to improve built asset management (BAM) decision-making during the in-use phase of hospital buildings.

Design/methodology/approach

A comprehensive document analysis and a participatory case study was undertaken with a regional NHS hospital to review the type of information that can be used to better inform BAM decision-making to develop a conceptual framework to improve information use during the health-care BAM process, test how the conceptual framework can be applied within a BAM division of a health-care organisation and develop a cloud-based BIM application.

Findings

BIM has the potential to facilitate better informed BAM decision-making by integrating a wide range of information related to the physical condition of built assets, resources available for BAM and the built asset’s contribution to health-care provision within an organisation. However, interdepartmental information sharing requires a significant level of time and cost investment and changes to information gathering and storing practices within the whole organisation.

Originality/value

This research demonstrated that the implementation of BIM during the in-use phase of hospital buildings is different to that in the design and construction phases. At the in-use phase, BIM needs to integrate and communicate information within and between the estates, facilities division and other departments of the organisation. This poses a significant change management task for the organisation’s information management systems. Thus, a strategically driven top-down organisational approach is needed to implement BIM for the in-use phase of hospital buildings.

Keywords

Acknowledgements

The work was funded by Royal Institution of Chartered Surveyors. Further details of the research could be found at www.rics.org/uk/news-insight/research/research-reports/building-information-modelling-to-support-healthcare-built-asset-management/. The authors also wish to acknowledge the Princess Alexandra hospital who participated in the case study.

Citation

Wanigarathna, N., Jones, K., Bell, A. and Kapogiannis, G. (2019), "Building information modelling to support maintenance management of healthcare built assets", Facilities, Vol. 37 No. 7/8, pp. 415-434. https://doi.org/10.1108/F-01-2018-0012

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles