Office Work Study
317
Abstract
Examines the application of work study methods to the efficiency of office workers. Discusses the basic Select, Record, Examine, Develop, Install, Maintain procedure of method study as well as forms design and control, office layout and quality control in the office. Concludes that recent initiatives such as TQM have highlighted the importance of every station of a procedure in determining product quality.
Keywords
Citation
Daniels, B. (1991), "Office Work Study", Work Study, Vol. 40 No. 6, pp. 15-21. https://doi.org/10.1108/EUM0000000002658
Publisher
:MCB UP Ltd
Copyright © 1991, MCB UP Limited