Managing Uncertainty in Multilevel Manufacturing Systems

Integrated Manufacturing Systems

ISSN: 0957-6061

Publication date: 1 April 1991

Abstract

The effectiveness of alternative buffering strategies in complex multilevel assembly manufacturing systems using the Material Requirement Planning (MRP) methodology is explored and assessed. The safety stock, safety lead time, “hard” safety capacity, and forecast inflation buffering strategies are tested under uncertainties of end‐item demand, resource supply, and task control. The MRP methodology is applied for scheduling along with a complex, realistic simulation model for execution of operations. Average inventory levels for end and component items, capacity utilisation, end‐item backorders and customer undersupport are used as performance measures. Experimental results establish safety stock and “hard” safety capacity as dominant buffering strategies under all uncertainty conditions, and task control is shown as the most disruptive uncertainty source.

Keywords

Citation

Vargas, G.A. and Dear, R.G. (1991), "Managing Uncertainty in Multilevel Manufacturing Systems", Integrated Manufacturing Systems, Vol. 2 No. 4, pp. 14-26. https://doi.org/10.1108/EUM0000000002081

Publisher

:

MCB UP Ltd

Copyright © 1991, MCB UP Limited

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
To rent this content from Deepdyve, please click the button.
If you think you should have access to this content, click the button to contact our support team.