To read this content please select one of the options below:

A Monetary Incentive Plan for Machine‐paced Operations

Biman Das (Technical University of Nova Scotia, Canada)
Alberto Garcia‐Diaz (Texas A&M University, USA)
Clarence L. Hough Jr. (Texas A&M University, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 July 1989

171

Abstract

For machine‐paced operations a two‐factor monetary incentive plan is developed by employing production quantity output and production waste as criteria for incentive earnings. The plan takes into account machine time allowance and increased operator work pace for manual work for establishing standards in a machine‐paced operation. The two incentive earning factors are given proper weights in terms of their relative economic importance. The weights are determined by comparing possible labour and material costs savings when the operators perform at incentive pace level. To demonstrate the working of the proposed monetary incentive plan an illustrative example is presented.

Keywords

Citation

Das, B., Garcia‐Diaz, A. and Hough, C.L. (1989), "A Monetary Incentive Plan for Machine‐paced Operations", International Journal of Operations & Production Management, Vol. 9 No. 7, pp. 30-44. https://doi.org/10.1108/EUM0000000001251

Publisher

:

MCB UP Ltd

Copyright © 1989, MCB UP Limited

Related articles