To read this content please select one of the options below:

The values and barriers of BIM implementation combination evaluation based on stakeholder theory: a study in China

Yansheng Chen (GBA Industry Development Research Centre, Guangdong Industry Polytechnic, Guangzhou, China)
Xiaotong Cai (School of Accounting, Guangdong University of Finance, Guangzhou, China)
Jie Li (Guangdong Industry Polytechnic, Guangzhou, China)
Peng Lin (Guangdong Industry Polytechnic, Guangzhou, China)
Huitong Song (Macau University of Science and Technology, Macau, China)
Guoqing Liu (Yinchuan Underground Comprehensive Pipe Gallery Operation and Maintenance Management Co., Ltd., Yinchuan, China)
Dongming Cao (Sinopec Sales Co., Ltd. Guangdong Petroleum Branch, Guangzhou, China)
Xiaohui Ma (China Gas Hongda Energy Trading Co., Ltd., Shenzhen, China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 19 April 2022

Issue publication date: 15 August 2023

478

Abstract

Purpose

This paper aims to the perspective of stakeholders, from external variables of the Building Information Modeling (BIM) system, users, task flow, the nature of the development of the execution process, organizational structure and policy impacts, that established a relationship among the internal concepts and intentions for the BIM application, individual or organizational differences, controlling interference factors and environmental constraints, discussed the combination of the values and barriers of BIM implementation.

Design/methodology/approach

Through the co-occurrence statistics and genre analysis based on co-citation context analysis and constructs the common information that impacts the combination of values and barriers of BIM implementation. Then, the paper chose the expert database of the green construction and intelligent building branch of the China construction association, and obtained 104 sample data through modified snowball sampling, using exploratory factor analysis with factor load linear functions, combined factor variance contribution rate weights.actor variance contribution rate weights.

Findings

The results show that eight aspects can be defined as the values of BIM implementation (VI), and the barriers of BIM implementation (BI) mainly come from five aspects caused by insufficient cognition and two aspects of an uncertain value in China.

Originality/value

This research reflects a combined evaluation of the values of BIM implementation and barriers of BIM and highlights the significance of the sustainable development of BIM technology and the value of building future informatization applications.

Keywords

Acknowledgements

The authors thank the anonymous reviewers for their useful comments on the earlier version of this article.

Funding: The authors acknowledge the Guangdong Province Philosophy and Social Sciences Planning Foundation, award no. GD20XGL49, GD21CGL13 and Guangzhou Base and Basic Applied Study Foundation, award no. 202102080475.

Citation

Chen, Y., Cai, X., Li, J., Lin, P., Song, H., Liu, G., Cao, D. and Ma, X. (2023), "The values and barriers of BIM implementation combination evaluation based on stakeholder theory: a study in China", Engineering, Construction and Architectural Management, Vol. 30 No. 7, pp. 2814-2836. https://doi.org/10.1108/ECAM-08-2020-0607