Revisiting storey enclosure method for early estimation of structural building construction cost

Chau Ngoc Dang (Graduate Program of Construction Management, Ho Chi Minh City University of Technology, Ho Chi Minh City, Vietnam)
Long Le-Hoai (Department of Construction Engineering and Management, Ho Chi Minh City University of Technology, Ho Chi Minh City, Vietnam)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 August 2018

Issue publication date: 10 August 2018

706

Abstract

Purpose

The purpose of this paper is to develop several predictive models for estimating the structural construction cost and establish range estimation for the structural construction cost using design information available in early stages of residential building projects.

Design/methodology/approach

Information about residential building projects is collected based on project documents from construction companies with regard to the design parameters and the actual structural construction costs at completion. Storey enclosure method (SEM) is fundamental for determining the building design parameters, forming the potential variables and developing the cost estimation models using regression analysis. Nonparametric bootstrap method is used to establish range estimation for the structural construction cost.

Findings

A model which is developed from an integration of advanced SEM, principle component analysis and regression analysis is robust in terms of predictability. In terms of range estimation, cumulative probability-based range estimates and confidence intervals are established. While cumulative probability-based range estimates provide information about the level of uncertainty included in the estimate, confidence intervals provide information about the variability of the estimate. Such information could be very crucial for management decisions in early stages of residential building projects.

Originality/value

This study could provide practitioners with a better understanding of the uncertainty and variability included in the cost estimate. Hence, they could make effective improvements on cost-related management approaches to enhance project cost performance.

Keywords

Citation

Dang, C.N. and Le-Hoai, L. (2018), "Revisiting storey enclosure method for early estimation of structural building construction cost", Engineering, Construction and Architectural Management, Vol. 25 No. 7, pp. 877-895. https://doi.org/10.1108/ECAM-07-2015-0111

Publisher

:

Emerald Publishing Limited

Copyright © 2018, Emerald Publishing Limited

Related articles