To read this content please select one of the options below:

Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model

Roya Amiri (Department of Civil Engineering, Faculty of Civil and Earth Resources Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran)
Javad Majrouhi Sardroud (Department of Civil Engineering, Faculty of Civil and Earth Resources Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran)
Vahid Momenaei Kermani (Department of Mathematics, Kerman Branch, Islamic Azad University, Kerman, Iran)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 8 March 2022

Issue publication date: 8 May 2023

302

Abstract

Purpose

The site layout has a significant impact on the efficiency of construction operations. Planning an effective site layout partly involves identifying and positioning temporary facilities such as tower cranes and areas on the jobsite for materials storage. This study proposes an approach to optimizing the type and location of the tower crane and material supply point on construction sites.

Design/methodology/approach

The problem is formulated into an integer linear programming (ILP) model considering the total cost of material transportation as the objective function and site conditions as constraints. The efficacy of the approach is demonstrated by finding the optimum site layout for a numerical example. The proposed model is validated and verified using two methods.

Findings

Results indicate that the proposed model successfully identifies the type and location of the tower crane and the location of material supply point, leading to approximately 20% cost reduction compared with when such features of a site layout are decided solely based on experience and educated guesses of the construction manager.

Originality/value

The primary contribution of this study is to present a modified linear mathematical model for site layout optimization that exhibits improved performance compared with previous models. The type and location of the tower crane and the material supply point as decision variables are extracted directly from solving the proposed model. The proposed model will help enhance time and cost efficiency on construction sites.

Keywords

Citation

Amiri, R., Majrouhi Sardroud, J. and Momenaei Kermani, V. (2023), "Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model", Engineering, Construction and Architectural Management, Vol. 30 No. 4, pp. 1444-1462. https://doi.org/10.1108/ECAM-06-2021-0517

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited

Related articles