Books and journals Case studies Expert Briefings Open Access
Advanced search

Amplifying the practicality of contemporary building information modelling (BIM) implementations for New Zealand green building certification (Green Star)

Ali GhaffarianHoseini (Department of Built Environment Engineering, Auckland University of Technology, Auckland, New Zealand)
Dat Tien Doan (Department of Built Environment Engineering, Auckland University of Technology, Auckland, New Zealand)
Nicola Naismith (Department of Built Environment Engineering, Auckland University of Technology, Auckland, New Zealand)
John Tookey (Department of Built Environment Engineering, Auckland University of Technology, Auckland, New Zealand)
Amirhosein GhaffarianHoseini (Department of Geography, University of Malaya, Kuala Lumpur, Malaysia)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Publication date: 17 July 2017

Abstract

Purpose

Green Star is becoming a broadly accepted mark of design quality and environmental sustainability. Compared to other green tools, Green Star is considered as one of main streams green assessment tools, which cover almost sustainable criteria. Simultaneously, building information modelling (BIM) has also been introduced into the industry. BIM is expected to aid designers to shift the construction industry towards more environmentally and economically sustainable construction practice. Whilst the aspirations of Green Star rating and BIM implementation are broadly aligned, in the context of New Zealand this has led to some disconnects in design strategy and process. The purpose of this paper is to improve the practicality of BIM implementations for delivering Green Star certification in New Zealand.

Design/methodology/approach

The extensive literature review is conducted through a series of incremental steps. A conceptual framework focussing on the relationship between benefits and challenges of BIM and Green Star is then developed.

Findings

BIM supports practitioners to achieve the majority of Green Star criteria (75 per cent). Energy efficiency criterion is the key factor affecting the assessment process of Green Star and National Australian Built Environment Rating System in New Zealand. Research questions about lessening the challenges which can be encountered during the BIM and Green Star implementation are developed.

Research limitations/implications

This paper is limited to a conceptual research. Further empirical research should be conducted to validate and modify the conceptual framework and the propositions presented in this paper to provide an initial insight into BIM and Green Star connectivity within the context of New Zealand.

Originality/value

This paper provided a clear picture for investors, developers, practitioners about benefits and challenges of BIM and Green Star implementation. The outcomes are anticipated to deliver visions for shifting the country further towards development of sustainable future cities.

Keywords

  • Building information modelling (BIM)
  • BIM tools
  • Green building certification

Citation

GhaffarianHoseini, A., Tien Doan, D., Naismith, N., Tookey, J. and GhaffarianHoseini, A. (2017), "Amplifying the practicality of contemporary building information modelling (BIM) implementations for New Zealand green building certification (Green Star)", Engineering, Construction and Architectural Management, Vol. 24 No. 4, pp. 696-714. https://doi.org/10.1108/ECAM-02-2016-0043

Download as .RIS

Publisher

:

Emerald Publishing Limited

Copyright © 2017, Emerald Publishing Limited

Please note you do not have access to teaching notes

You may be able to access teaching notes by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
To rent this content from Deepdyve, please click the button.
Rent from Deepdyve
If you think you should have access to this content, click the button to contact our support team.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2021 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication sitemap

Policies and information

  • Privacy notice
  • Site policies
  • Modern Slavery Act Opens in new window
  • Chair of Trustees governance statement Opens in new window
  • COVID-19 policy Opens in new window
Manage cookies

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald Engage?

    You can join in the discussion by joining the community or logging in here.
    You can also find out more about Emerald Engage.

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Questions & More Information

    Answers to the most commonly asked questions here