TY - JOUR AB - Purpose Monitoring and evaluation (M&E) of projects is a very important aspect of project execution and management. This is because proper M&E practices have a significant effect on the successful delivery of projects. The purpose of this paper is to examine the impact of project M&E practices on construction project success criteria.Design/methodology/approach Structured questionnaires were used to solicit the views of project professionals in the Ghanaian construction industry. The questions were developed through critical review of literature and complemented with a pilot interview on the subject. This paper utilized a partial least square–structural equation modeling (PLS–SEM) to establish the impact of project M&E practices (constructs) on project success based on the hypothesis.Findings Results showed that M&E practices had a positive statistical significant relationship with construction project success criteria. In addition, health and safety performance and project scope showed a strong significant relation with M&E practice, implying that, in developing countries, these two main constructs should be given critical attention in achieving project success.Practical implications The findings of this study may be useful to organizations in determining M&E techniques that are relevant and contribute highly to project success. This may go a long way to increase productivity and accelerate the rate of successful project delivery.Originality/value The application of rigorous analysis, PLS–SEM, gives a more reliable information on M&E practices that can ensure successful delivery of construction projects. VL - 9 IS - 3 SN - 2044-124X DO - 10.1108/BEPAM-11-2018-0135 UR - https://doi.org/10.1108/BEPAM-11-2018-0135 AU - Kissi Ernest AU - Agyekum Kofi AU - Baiden Bernard Kofi AU - Tannor Reuben Agyei AU - Asamoah George Effah AU - Andam Emmanuel Tweneboah PY - 2019 Y1 - 2019/01/01 TI - Impact of project monitoring and evaluation practices on construction project success criteria in Ghana T2 - Built Environment Project and Asset Management PB - Emerald Publishing Limited SP - 364 EP - 382 Y2 - 2024/04/20 ER -