To read this content please select one of the options below:

Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach

Sahar Tadayonirad (Department of Industrial Engineering, K.N.Toosi University, Tehran, Iran)
Hany Seidgar (Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran)
Hamed Fazlollahtabar (Department of Industrial Engineering, School of Engineering, Damghan University, Damghan, Iran)
Rasoul Shafaei (Department of Industrial Engineering, K.N.Toosi University, Tehran, Iran)

Assembly Automation

ISSN: 0144-5154

Article publication date: 23 August 2019

Issue publication date: 18 October 2019

423

Abstract

Purpose

In real manufacturing systems, schedules are often disrupted with uncertainty factors such as random machine breakdown, random process time, random job arrivals or job cancellations. This paper aims to investigate robust scheduling for a two-stage assembly flow shop scheduling with random machine breakdowns and considers two objectives makespan and robustness simultaneously.

Design/methodology/approach

Owing to its structural and algorithmic complexity, the authors proposed imperialist competitive algorithm (ICA), genetic algorithm (GA) and hybridized with simulation techniques for handling these complexities. For better efficiency of the proposed algorithms, the authors used artificial neural network (ANN) to predict the parameters of the proposed algorithms in uncertain condition. Also Taguchi method is applied for analyzing the effect of the parameters of the problem on each other and quality of solutions.

Findings

Finally, experimental study and analysis of variance (ANOVA) is done to investigate the effect of different proposed measures on the performance of the obtained results. ANOVA's results indicate the job and weight of makespan factors have a significant impact on the robustness of the proposed meta-heuristics algorithms. Also, it is obvious that the most effective parameter on the robustness for GA and ICA is job.

Originality/value

Robustness is calculated by the expected value of the relative difference between the deterministic and actual makespan.

Keywords

Acknowledgements

Conflict of interest: There is no conflict of interest in this paper.

Citation

Tadayonirad, S., Seidgar, H., Fazlollahtabar, H. and Shafaei, R. (2019), "Robust scheduling in two-stage assembly flow shop problem with random machine breakdowns: integrated meta-heuristic algorithms and simulation approach", Assembly Automation, Vol. 39 No. 5, pp. 944-962. https://doi.org/10.1108/AA-10-2018-0165

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles