Factors that affect the design and implementation of team‐based performance measurement systems

Kepa Mendibil (Centre for Strategic Manufacturing, DMEM, University of Strathclyde, Glasgow, UK)
Jillian MacBryde (Centre for Strategic Manufacturing, DMEM, University of Strathclyde, Glasgow, UK)

International Journal of Productivity and Performance Management

ISSN: 1741-0401

Article publication date: 1 February 2006

5143

Abstract

Purpose

The purpose of this paper is to highlight the factors that enable and/or constrain the design and implementation of team‐based performance measurement systems.

Design/methodology/approach

This research study departed from an industrially‐led project. The research strategies used (i.e. case studies, industrial workshops and action research) are suited to the applied and empirical nature of the study. The paper reviews the existing literature on team performance measurement. It then presents the findings based on a exploratory phase and a theory refinement phase.

Findings

The results of this study suggest that there are eleven factors affecting the design and implementation of TPMS. It also suggests that these factors are inter‐related with each other. As a result, the impact of one factor can reduce and even eliminate the impact of other factors.

Research limitations/implications

There are two main limitations of this research. Firstly, carrying out more than one longitudinal study would increase the validity of the findings. Secondly, evidence was mainly gathered from companies from the manufacturing sector.

Practical implications

These findings provide senior managers, human resource specialists and team leaders with the foundations to create the right conditions to design and implement TPMS.

Originality/value

The main contribution this paper makes is that it highlights the factors affecting the design and implementation of measurement system in the context of teams. This research identifies three factors (i.e. team maturity, focus and content of appraisal and reward systems, business process view) that are specific to TPMS design and that have not been fully addressed by previous research.

Keywords

Citation

Mendibil, K. and MacBryde, J. (2006), "Factors that affect the design and implementation of team‐based performance measurement systems", International Journal of Productivity and Performance Management, Vol. 55 No. 2, pp. 118-142. https://doi.org/10.1108/17410400610641708