To read this content please select one of the options below:

Ordering Policy for Planned Maintenance with Salvage Value

Young T. Park (Systems Management Engineering, Sungkyunkwan University, Suwon 440‐746, Korea)
Sun Jing (School of Economics and Management, Tsinghua University, Beijing 100084, China)

Asian Journal on Quality

ISSN: 1598-2688

Article publication date: 18 December 2006

95

Abstract

A spare ordering policy is considered for planned maintenance. Introducing the ordering, uptime, downtime, inventory costs and salvage value, we derive the expected cost effectiveness. The problem is to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit which maximize the expected cost effectiveness. Some properties regarding the optimal policy are derived, and a numerical example is included to explain the proposed model.

Keywords

Citation

Park, Y.T. and Jing, S. (2006), "Ordering Policy for Planned Maintenance with Salvage Value", Asian Journal on Quality, Vol. 7 No. 3, pp. 15-23. https://doi.org/10.1108/15982688200600024

Publisher

:

Emerald Group Publishing Limited

Copyright © 2006, Emerald Group Publishing Limited

Related articles