To read this content please select one of the options below:

Scheduling for improving productivity of the automated manufacturing system

Jungsang Choi (Department of Industrial Engineering, Kangnam University, Kyonggi 449‐702, Korea)
Gilsang Jang (Department of Industrial Information Systems, Dongguk University, Kyongbuk 780‐714, Korea)

Asian Journal on Quality

ISSN: 1598-2688

Article publication date: 21 August 2001

120

Abstract

In this paper jobshop scheduling problem was considered on automated manufacturing systems with the closed loop and unidirectional material handling system. The objective of this research is to develop and evaluate heuristic scheduling procedures to improve productivity by minimizing makespan. Especially travel time of material handling system as well as processing time was considered in the proposed alogorithm. The heiristic algorithms are implemented for various cases. The results show that the proposal algorithms provide better solutions in productivity, frequency, job waiting time and the number of waiting jobs than the random scheduling algorithm.

Keywords

Citation

Choi, J. and Jang, G. (2001), "Scheduling for improving productivity of the automated manufacturing system", Asian Journal on Quality, Vol. 2 No. 2, pp. 101-120. https://doi.org/10.1108/15982688200100019

Publisher

:

MCB UP Ltd

Copyright © 2001, MCB UP Limited

Related articles