An Experimental Study to Improve Due‐date Performance

Mei‐Ting Wang (Department of Industrial Engineering and Management, National Chiao‐Tung University, 1001 University Road, Hsin‐chu, Taiwan 300, R.O.C.)
MRong‐Kwei Li (Department of Industrial Engineering and Management, National Chiao‐Tung University, 1001 University Road, Hsin‐chu, Taiwan 300, R.O.C.)
Ching‐Piao Chen (Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, R.O.C.)
Hsien‐Ching Chen (Center for General Education, Chung‐Hua University, No. 707, Sec. 2, WuFu Rd., Hsin‐Chu, Taiwan 300, R.O.C.)
Chih‐Hung Tsai (Department of Information Management, Yuanpei University, No. 306, Yuanpei Street, Hsin‐Chu, Taiwan)

Asian Journal on Quality

ISSN: 1598-2688

Article publication date: 18 December 2009

337

Abstract

Due‐date performance (DDP) is a very important performance indicator for the companies. Thus, companies with a high hit rate would have greater competitive advantage; on the contrary, companies that delay customers' orders frequently would lose sales opportunities and reputations. Therefore, there were many academic studies and practical efforts to improve DDP in the past, but the problem of low hit rate still exists. In order to increase the hit rate, some companies have focused on reducing the variation, while others focus on production management, but is the real problem affecting the low rate variability or production management? This is indeed difficult to be validated through practice. Therefore, this study designed three scenarios, tested each scenario for 30 times, each test involved seven subjects. The tests were to provide counter‐evidence in the Job Shop environment without variation. If the variation is the main factor of affecting hit rate, the rate at this time should be good; otherwise, the assumption that variation is the main cause is rebutted. The results demonstrated that production management planning is the main cause, and the method of enhancing the hit rate is obtained during the test.

Keywords

Citation

Wang, M., Li, M., Chen, C., Chen, H. and Tsai, C. (2009), "An Experimental Study to Improve Due‐date Performance", Asian Journal on Quality, Vol. 10 No. 3, pp. 13-36. https://doi.org/10.1108/15982680911021160

Publisher

:

Emerald Group Publishing Limited

Copyright © 2009, Emerald Group Publishing Limited

Related articles