To read this content please select one of the options below:

Assessment of competitive tendering methods of procuring educational building projects in Nigeria

O.A. Adedokun (Department of Quantity Surveying, The Federal University of Technology, Akure, Nigeria)
O.T. Ibironke (Department of Quantity Surveying, The Federal University of Technology, Akure, Nigeria)
S.O. Babatunde (Department of Quantity Surveying, Obafemi Awolowo University, Ile‐Ife, Nigeria)

Journal of Facilities Management

ISSN: 1472-5967

Article publication date: 15 February 2013

2118

Abstract

Purpose

The purpose of this paper is to assess educational building projects with a view to determining the level of utilization of competitive tendering methods, factors influencing their choice and predisposition to risk factors, in order to ensure effective construction project delivery.

Design/methodology/approach

The paper assessed the level of utilization of competitive tendering methods, the factors influencing their choice and finally the predisposition of each of the methods to risk factors, adopting survey method which involved primary data, obtained by using multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers).

Findings

It was found that the usage of open competitive tendering methods outweighed selective tendering method of procurement as a result of accountability and price competition involved, which made it predisposed to not only financial risk factors, but also political and logistics factors.

Research limitations/implications

Multiple‐choice questionnaire administered to the respondents (architects, quantity surveyors, builders, structural engineers, civil engineers, mechanical and electrical engineers) was limited to selected institutions in the southwestern zone of Nigeria.

Practical implications

The most widely adopted method (open competitive tendering method) suffers from risk factors such as selective but high premium being placed on financial and logistic risk factors in order to achieve hitch‐free construction project delivery. These measures will help the stakeholders in assessing degrees of project complexity and better manage the potential risks that might be induced to different levels of competitive tendering methods of project procurement in relation to educational building projects.

Originality/value

This empirical investigation provides strong evidence on the procurement of educational building projects in response to due process policy. The findings provided insightful perspectives to define and understand project complexity. For stakeholders, understanding and addressing the complexity help to improve project planning and implementation.

Keywords

Citation

Adedokun, O.A., Ibironke, O.T. and Babatunde, S.O. (2013), "Assessment of competitive tendering methods of procuring educational building projects in Nigeria", Journal of Facilities Management, Vol. 11 No. 1, pp. 81-94. https://doi.org/10.1108/14725961311301484

Publisher

:

Emerald Group Publishing Limited

Copyright © 2013, Emerald Group Publishing Limited

Related articles