Stereolithography build time estimation based on volumetric calculations

Ian Campbell (Department of Design and Technology, Loughborough University, Loughborough, UK)
Jacques Combrinck (Central University of Technology, Bloemfontein, South Africa)
Deon de Beer (Central University of Technology, Bloemfontein, South Africa)
Ludrick Barnard (Central University of Technology, Bloemfontein, South Africa)

Rapid Prototyping Journal

ISSN: 1355-2546

Article publication date: 26 September 2008

1667

Abstract

Purpose

Not all the inventors and designers have access to computer‐aided design (CAD) software to transform their design or invention into a 3D solid model. Therefore, they cannot submit an STL file to a rapid prototyping (RP) service bureau for a quotation but perhaps only a 2D sketch or drawing. This paper proposes an alternative approach to build time estimation that will enable cost quotations to be issued before 3D CAD has been used.

Design/methodology/approach

The study presents a method of calculating build time estimations within a target error limit of 10 per cent of the actual build time of a prototype. This is achieved by using basic volumetric shapes, such as cylinders and cones, added together to represent the model in the 2D sketch. By using this information the build time of the product is then calculated with the aid of models created in a mathematical solving software package.

Findings

The development of the build time estimator and its application to several build platforms are described together with an analysis of its performance in comparison with the benchmark software. The estimator was found to meet its target 10 per cent error limit in 80 per cent of the stereolithography builds that were analysed.

Research limitations/implications

The estimator method was not able to handle multi‐component complex parts builds in a timely manner. There is a trade‐off between accuracy and processing time.

Practical implications

The output from the estimator can be fed directly into cost quotations to be sent to RP bureau customers at a very early stage in the design process.

Originality/value

Unlike all the other build estimators that were encountered, this method works directly from a 2D sketch or drawing rather than a 3D CAD file.

Keywords

Citation

Campbell, I., Combrinck, J., de Beer, D. and Barnard, L. (2008), "Stereolithography build time estimation based on volumetric calculations", Rapid Prototyping Journal, Vol. 14 No. 5, pp. 271-279. https://doi.org/10.1108/13552540810907938

Publisher

:

Emerald Group Publishing Limited

Copyright © 2008, Emerald Group Publishing Limited

Related articles