To read this content please select one of the options below:

The economic design of • and S2 control charts with preventive maintenance and increasing hazard rate

Huan‐Neng Chiu (National Taiwan Institute of Technology, Taiwan, Republic of China)
Bo‐Shi Huang (National Taiwan Institute of Technology, Taiwan, Republic of China)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 1 December 1995

496

Abstract

Develops the joint economic designs of • and S2 control charts under four operating policies to monitor the process in a situation where the occurrence of the assignable cause follows a general distribution with an increasing hazard rate. The four operating policies can be chosen by quality controllers to cope with the specific process situation. Policy I and policy II assume that the process performs the preventive maintenance programme at equal and decreasing sampling time intervals, respectively. Policy III and policy IV in turn merely take samples using the non‐uniform and uniform sampling interval schemes without preventive maintenance. The derivation of the four models is not very difficult, so it can be used to derive another model. Offers numerical examples to compare the economic designs and the total expected costs per hour of the four models. Finds, from the computational results, policy II is the best for adoption in the design of • and S2 control charts. The results also show that the proposed solution procedure is more accurate and better than Rahim et al.’s and Chung and Chen’s procedures. Concludes with remarks and some advantages of introducing the periodic preventive maintenance policy into a process.

Keywords

Citation

Chiu, H. and Huang, B. (1995), "The economic design of • and S2 control charts with preventive maintenance and increasing hazard rate", Journal of Quality in Maintenance Engineering, Vol. 1 No. 4, pp. 17-40. https://doi.org/10.1108/13552519510105188

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles