TY - JOUR AB - This paper presents a new calculating methodology for estimating the quantitative monetary managerial effects as a result of total productive maintenance (TPM) activities. The suggested methodology is to calculate the total saving monetary amount composed of contribution profit and saving costs that are obtained by improving the overall equipment efficiency (OEE) of processing type equipment. The managerial effect that is the total saved monetary effect in keeping the OEE at the 1 percent upraised condition during a given period can be calculated by the sum of additive contribution profit and saved manufacturing cost. The proposed computation methodology is demonstrated by applying to a real industrial processing type of manufacturing equipment. This newly presented model is expected to contribute to raise the maturity of TPM activities by grasping the monetary quantitative managerial effects periodically. VL - 10 IS - 4 SN - 1355-2511 DO - 10.1108/13552510410564882 UR - https://doi.org/10.1108/13552510410564882 AU - Kwon Ohwoon AU - Lee Hongchul PY - 2004 Y1 - 2004/01/01 TI - Calculation methodology for contributive managerial effect by OEE as a result of TPM activities T2 - Journal of Quality in Maintenance Engineering PB - Emerald Group Publishing Limited SP - 263 EP - 272 Y2 - 2024/04/24 ER -