Optimum replacement intervals with random time horizon

Won Young Yun (Pusan National University, Korea, and)
Chung Hyeon Choi (Agency for Defense Development, Kyungnam, Korea)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Publication date: 1 December 2000

Abstract

An optimization problem to obtain the optimal replacement interval is studied. The system is minimally repaired at failure and is replaced by a new one at age T. The model assumes that the time horizon associated with the number of replacements is random. The total expected cost is calculated, and the optimal replacement interval minimizing the cost is found. A numerical example is used to compare the costs associated with an infinite time line and a random time line, which this model used.

Keywords

Citation

Young Yun, W. and Hyeon Choi, C. (2000), "Optimum replacement intervals with random time horizon", Journal of Quality in Maintenance Engineering, Vol. 6 No. 4, pp. 269-274. https://doi.org/10.1108/13552510010346798

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 2000, MCB UP Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
If you would like to contact us about accessing this content, click the button and fill out the form.
To rent this content from Deepdyve, please click the button.