To read this content please select one of the options below:

Optimum replacement intervals with random time horizon

Won Young Yun (Pusan National University, Korea, and)
Chung Hyeon Choi (Agency for Defense Development, Kyungnam, Korea)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 1 December 2000

636

Abstract

An optimization problem to obtain the optimal replacement interval is studied. The system is minimally repaired at failure and is replaced by a new one at age T. The model assumes that the time horizon associated with the number of replacements is random. The total expected cost is calculated, and the optimal replacement interval minimizing the cost is found. A numerical example is used to compare the costs associated with an infinite time line and a random time line, which this model used.

Keywords

Citation

Young Yun, W. and Hyeon Choi, C. (2000), "Optimum replacement intervals with random time horizon", Journal of Quality in Maintenance Engineering, Vol. 6 No. 4, pp. 269-274. https://doi.org/10.1108/13552510010346798

Publisher

:

MCB UP Ltd

Copyright © 2000, MCB UP Limited

Related articles