To read this content please select one of the options below:

Obstacles to successful management of projects and decision and tips for coping with them

Ana Shetach (Management of Health Systems Department, The Max Stern Academic College of Emek‐Yezreel, Haifa, Israel)

Team Performance Management

ISSN: 1352-7592

Article publication date: 19 October 2010

2226

Abstract

Purpose

The purpose of the paper is to classify the full scope of hazards in the way to effective project‐ and decision‐management in teams, and to present team leaders with a practical set of guidelines for coping with those obstacles, towards successful achievements.

Design/methodology/approach

The paper provides a classification of the full spectrum of possible factors responsible for mishaps, faults and failures which regularly tend to occur within managerial and organizational activities at all levels. It goes on to present a set of two tools that, jointly applied, can provide managers with the necessary control to lead more team processes and projects towards successful terminations: the “revised decision square model” and the “capi” model.

Findings

The paper provides evidence in the form of quotes from testimonies of managers who have adopted the proposed strategy for their every‐day use within their teams.

Practical implications

The paper offers a practical step‐by‐step set of guidelines to lead managers towards a relatively high level of control in the management of effective and efficient team decision making and implementation processes, ensuring their route towards successful achievements.

Originality/value

Limited attention has been given in the literature to the studying of practical and applicable managerial techniques to successful decision‐implementation in teams. This paper focuses on this neglected domain, proposing a solution, in the form of an integrative strategy.

Keywords

Citation

Shetach, A. (2010), "Obstacles to successful management of projects and decision and tips for coping with them", Team Performance Management, Vol. 16 No. 7/8, pp. 329-342. https://doi.org/10.1108/13527591011090628

Publisher

:

Emerald Group Publishing Limited

Copyright © 2010, Emerald Group Publishing Limited

Related articles