To read this content please select one of the options below:

Implementing CIMS in Shenyang Blower Works

Jingsong Xue (Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang, Liaoning, PR China)
Haibin Yu (Shenyang Institute of Automation, Chinese Academy of Sciences, Shenyang, Liaoning, PR China)
Rulin Mu (Office of CIMS, Shenyang Blower Works, Shenyang, Liaoning, PR China)
Kemin Lin (Office of CIMS, Shenyang Blower Works, Shenyang, Liaoning, PR China)

Integrated Manufacturing Systems

ISSN: 0957-6061

Article publication date: 1 April 1999

684

Abstract

Computer‐integrated manufacturing (CIM) has been paid serious attention in most of the industrialized countries. Shenyang Blower Works (SBW), the largest enterprise developing, designing and fabricating turbine compressors, blowers and large fans in China, made its production plan according to orders due to its single or small batch production mode. For this SBW decided to adopt the CIM philosophy and build CIM systems (CIMS) to increase the enterprise’s market competitiveness. SBW has begun to develop CIMS going through the steps of feasibility study, primary design, detailed design and a partial implementation‐breakthrough project since 1990. A relatively perfect computer support environment for the computer‐integrated manufacturing system in Shenyang Blower Works (SB‐CIMS), especially for the primary integrated application software systems, has been completed. This accounted for various economic benefits.

Keywords

Citation

Xue, J., Yu, H., Mu, R. and Lin, K. (1999), "Implementing CIMS in Shenyang Blower Works", Integrated Manufacturing Systems, Vol. 10 No. 2, pp. 89-94. https://doi.org/10.1108/09576069910257554

Publisher

:

MCB UP Ltd

Copyright © 1999, MCB UP Limited

Related articles