TY - JOUR AB - Gradual phasing out of manual methods through sequential substitution of machines may well represent the only viable manufacturing strategy option for many job shops particularly in developing countries. For such job shop projects with limited capital, investment in buildings and machines needs to be phased so as to benefit from added capital from reinvested earnings. Describes a dynamic integer model suitable for such investment scheduling. Suggests that the model was solved with a readily implementable heuristic which employs suitable decision rules for scheduling machinery purchases and factory space construction in modular units. The model will find ready application in emerging job shop projects of many developing countries. VL - 8 IS - 4 SN - 0957-6061 DO - 10.1108/09576069710182045 UR - https://doi.org/10.1108/09576069710182045 AU - Aderoba Adeyemi PY - 1997 Y1 - 1997/01/01 TI - A sequential model for concurrent expansion in machinery and buildings using reinvested earnings T2 - Integrated Manufacturing Systems PB - MCB UP Ltd SP - 223 EP - 230 Y2 - 2024/05/11 ER -