To read this content please select one of the options below:

Performance prediction and diagnosis in two production departments

Paul P.M. Stoop (Department of Operations Planning and Control, Eindhoven University of Technology, The Netherlands)
J. Will M. Bertrand (Eindhoven University of Technology, The Netherlands)

Integrated Manufacturing Systems

ISSN: 0957-6061

Article publication date: 1 April 1997

3476

Abstract

In complex, job‐shop‐like production departments it is usually very difficult to predict the near‐future logistic performance as well as to explain or diagnose objectively why and how a certain performance has been achieved. Presents a prediction and diagnosis method that has been developed and tested in two production departments. Describes how the method provides realistic logistic performance targets in the short term with respect to the throughput of a production department and order completion times. The method also quantitatively determines ex post the impact of occurred disturbances on the realized performance. In the pilot project the method provided a clearer insight into relationships between logistic key variables, gave decision support to the capacity allocation decision, and generated reliable performance targets for the short term. More importantly, the actual performance became more open to discussion due to the objective explanation of the achieved performance, which opens the way to performance improvements.

Keywords

Citation

Stoop, P.P.M. and Will M. Bertrand, J. (1997), "Performance prediction and diagnosis in two production departments", Integrated Manufacturing Systems, Vol. 8 No. 2, pp. 103-109. https://doi.org/10.1108/09576069710165783

Publisher

:

MCB UP Ltd

Copyright © 1997, MCB UP Limited

Related articles