To read this content please select one of the options below:

Bottleneck allocation methodology (BAM): an algorithm

Gerhard Plenert (Gerhard Plenert is a Senior Principal at American Management Systems, Fair Oaks, California, USA.)

Logistics Information Management

ISSN: 0957-6053

Article publication date: 1 October 1999

1528

Abstract

Takes the development of a new optimization process for production scheduling and develops it into a systematic‐mathematical algorithm. Tests this algorithm against a simulated production environment and compares the generated schedules against those generated by EOQ, MRP, JIT, and OPT. The result is that bottleneck allocation methodology (BAM), with its critical resource based capacity scheduling out‐performs these other models in an intermittent demand discrete manufacturing environment.

Keywords

Citation

Plenert, G. (1999), "Bottleneck allocation methodology (BAM): an algorithm", Logistics Information Management, Vol. 12 No. 5, pp. 378-385. https://doi.org/10.1108/09576059910295850

Publisher

:

MCB UP Ltd

Copyright © 1999, MCB UP Limited

Related articles