Books and journals Case studies Expert Briefings Open Access
Advanced search

A simulation approach to manage finished goods inventory replenishment economically in a mixed push/pull environment

Massimo Bertolini (Massimo Bertolini is a PhD Candidate at Dipartimento di Ingegneria Industriale, Università degli Studi di Parma, Parma, Italy.)
Antonio Rizzi (Antonio Rizzi is Professor in Logistics Management, at Dipartimento di Ingegneria Industriale, Università degli Studi di Parma, Parma, Italy.)

Logistics Information Management

ISSN: 0957-6053

Publication date: 1 October 2002

Abstract

In this paper we introduce a simulative model, designed and developed to optimally manage an integrated finished goods inventory system, and suitable for adoption in a wide range of make to stock manufacturing firms. The goal of the model is to manage optimally finished goods inventory levels, in order to minimize costs deriving from holding inventory and from adjustment to the master production schedule (MPS) to prevent stock‐outs. A trade off is sought between these costs components. The input variables of the model are: safety stock levels, assessed through coefficients k1, k2 and k3, and the stochastic distribution functions of products demand. The model performances are assessed considering the annual total cost for the inventory management. The model is then tested by a numerical application. The case considered refers to a major firm operating in the zootechnical feeds production industry.

Keywords

  • Inventory
  • Management
  • Stock control
  • Optimization
  • Flexibility
  • Simulation

Citation

Bertolini, M. and Rizzi, A. (2002), "A simulation approach to manage finished goods inventory replenishment economically in a mixed push/pull environment", Logistics Information Management, Vol. 15 No. 4, pp. 281-293. https://doi.org/10.1108/09576050210436129

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 2002, MCB UP Limited

Please note you do not have access to teaching notes

You may be able to access teaching notes by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
To rent this content from Deepdyve, please click the button.
Rent from Deepdyve
If you think you should have access to this content, click the button to contact our support team.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2021 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication sitemap

Policies and information

  • Privacy notice
  • Site policies
  • Modern Slavery Act Opens in new window
  • Chair of Trustees governance statement Opens in new window
  • COVID-19 policy Opens in new window
Manage cookies

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald Engage?

    You can join in the discussion by joining the community or logging in here.
    You can also find out more about Emerald Engage.

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Questions & More Information

    Answers to the most commonly asked questions here