To read this content please select one of the options below:

The role of decouplers in JIT pull apparel cells

J.T. Black (Department of Industrial Engineering, Auburn University, Alabama, USA)
Joseph C. Chen (Department of Industrial Engineering, Auburn University, Alabama, USA)

International Journal of Clothing Science and Technology

ISSN: 0955-6222

Article publication date: 1 March 1995

620

Abstract

Various staff methodologies of a just‐in‐time (JIT) apparel assembly cell with various numbers of walking workers, and various levels of process time variation were discussed and evaluated by simulation models. Decouplers are placed between two workstations (or subcells) to improve capability and flexibility in an apparel cell. Decouplers enable JIT pull cells to operate with minimum stock‐on‐hand and allow parts and information to flow in opposite directions. Decouplers also provide the JIT pull cell with “make one, check one, and pass one on” capability. A manned assembly cell’s throughput rate depends on the number of workers in the cell and on the variation in each worker’s processing time. Normally, as the processing time variation increases, the throughput rate decreases. However, these simulation studies show that doubling the decoupler capacity increases the cell’s output, even as the processing time variation increases.

Keywords

Citation

Black, J.T. and Chen, J.C. (1995), "The role of decouplers in JIT pull apparel cells", International Journal of Clothing Science and Technology, Vol. 7 No. 1, pp. 17-35. https://doi.org/10.1108/09556229510080693

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles