To read this content please select one of the options below:

Constructing harmony

The TQM Magazine

ISSN: 0954-478X

Article publication date: 1 June 1991

232

Abstract

Suggests that the construction industry′s reputation for poor quality, including the failure to complete on time and within budget is well‐deserved, but that quality management holds the key to great improvements in this contractual minefield. Examines the role played by arbitration as an alternative to the law courts in construction disputes, plus the various relationships involved in construction industry project management. Illustrates four frequently conflicting elements that must be resolved by discussion before the project gets under way and argues that good management depends on balancing conflicting demands and negotiating a settlement of potential and actual disputes. Shows how contract management adjudication procedures can be controlled, from the architect′s original design to the hand‐over of the final building/edifice, concluding that, alongside TQM, a neutral adjudication tribunal is more likely to bring about a solution if it recognises the particular management culture associated with the construction industry.

Keywords

Citation

Baden Hellard, R. (1991), "Constructing harmony", The TQM Magazine, Vol. 3 No. 6. https://doi.org/10.1108/09544789110034050

Publisher

:

MCB UP Ltd

Copyright © 1991, MCB UP Limited

Related articles