The optimization of road building schedule based on budget restriction
Abstract
Purpose
The purpose of this paper is to present a model to determine which roads to be built in each stage with limited budget.
Design/methodology/approach
A multistage network discrete expansion model with budget restriction is formulated and a heuristic algorithm is developed by the technique of comparing the original shortest paths and the sum of crossed shortest paths to avoid computing the shortest paths matrix repeatedly.
Findings
The optimal approach has a very significant effect in finding which roads to be built by the largest net benefit.
Research limitations/implications
The paper discusses a new multistage network discrete expansion problem is the main research implications.
Practical implications
The optimal choice for road building schedule of new urban district when budgets were limited.
Originality/value
The paper presents a model and an algorithm for the optimization of road building schedule based on budget restriction.
Keywords
Citation
Weng, K. and Qu, B. (2009), "The optimization of road building schedule based on budget restriction", Kybernetes, Vol. 38 No. 3/4, pp. 441-447. https://doi.org/10.1108/03684920910944146
Publisher
:Emerald Group Publishing Limited
Copyright © 2009, Emerald Group Publishing Limited