Books and journals Case studies Expert Briefings Open Access
Advanced search

Preferred risk allocation in target cost contracts in construction

Joseph H.L. Chan (Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China)
Daniel W.M. Chan (Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China)
Patrick T.I. Lam (Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China)
Albert P.C. Chan (Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China)

Facilities

ISSN: 0263-2772

Publication date: 18 October 2011

Abstract

Purpose

–

The purpose of this paper is to identify the party most preferred to take the risks associated with the target cost contracts and guaranteed maximum price contracts (TCC/GMP) in the Hong Kong context.

Design/methodology/approach

–

An empirical questionnaire survey was conducted with the relevant industrial practitioners to solicit their preferences of risk allocation in TCC/GMP construction projects in Hong Kong.

Findings

–

The survey findings indicated that risks on tender documentation and project design are better borne by clients, while construction related risks are perceived to be taken by contractors. The research findings are consistent with other similar studies on risk allocation in construction projects in general.

Practical implications

–

This paper has developed a preferred risk allocation scheme for the delivery of future TCC/GMP projects, taking Hong Kong as an example. It can serve as a useful guide for decision makers to determine an optimal risk allocation at the planning stage of a TCC/GMP scheme.

Originality/value

–

The paper can benefit both academic researchers and industrial practitioners in generating an equitable risk sharing mechanism for TCC/GMP projects. It provides sufficient empirical evidence, added to the growing body of knowledge and lays a solid foundation for further research such as an international comparison of various risk allocation schemes associated with this kind of contractual arrangement.

Keywords

  • Target cost contracts
  • Guaranteed maximum price contracts
  • Procurement
  • Risk allocation
  • Construction industry
  • China
  • Contract costs

Citation

Chan, J.H.L., Chan, D.W.M., Lam, P.T.I. and Chan, A.P.C. (2011), "Preferred risk allocation in target cost contracts in construction", Facilities, Vol. 29 No. 13/14, pp. 542-562. https://doi.org/10.1108/02632771111178364

Download as .RIS

Publisher

:

Emerald Group Publishing Limited

Copyright © 2011, Emerald Group Publishing Limited

Please note you do not have access to teaching notes

You may be able to access teaching notes by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
If you think you should have access to this content, click the button to contact our support team.
Contact us

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
Login
To rent this content from Deepdyve, please click the button.
Rent from Deepdyve
If you think you should have access to this content, click the button to contact our support team.
Contact us
Emerald Publishing
  • Opens in new window
  • Opens in new window
  • Opens in new window
  • Opens in new window
© 2021 Emerald Publishing Limited

Services

  • Authors Opens in new window
  • Editors Opens in new window
  • Librarians Opens in new window
  • Researchers Opens in new window
  • Reviewers Opens in new window

About

  • About Emerald Opens in new window
  • Working for Emerald Opens in new window
  • Contact us Opens in new window
  • Publication sitemap

Policies and information

  • Privacy notice
  • Site policies
  • Modern Slavery Act Opens in new window
  • Chair of Trustees governance statement Opens in new window
  • COVID-19 policy Opens in new window
Manage cookies

We’re listening — tell us what you think

  • Something didn’t work…

    Report bugs here

  • All feedback is valuable

    Please share your general feedback

  • Member of Emerald Engage?

    You can join in the discussion by joining the community or logging in here.
    You can also find out more about Emerald Engage.

Join us on our journey

  • Platform update page

    Visit emeraldpublishing.com/platformupdate to discover the latest news and updates

  • Questions & More Information

    Answers to the most commonly asked questions here