Determination of master production schedule replanning frequency for various forecast window intervals

Jay Nathan (St. John’s University, Jamaica, New York, USA)
Ray Venkataraman (Penn State University, Erie, Pennsylvania, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 August 1998

1374

Abstract

This paper examines the impact of forecast window intervals on replanning frequencies for a rolling horizon master production schedule (MPS). The problem environment for this study is an actual MPS operation of a paint company and includes features such as multiple production lines, multiple products, capacity constraints, minimum inventory requirements. A mixed integer goal programming model formulated for the MPS problem is used to analyze the impact of forecast window interval length on replanning frequencies and MPS performance in a rolling horizon setting. Given demand certainty, results indicate that the length of the forecast window interval influences the choice of replanning frequency for this company environment. A three‐month forecast window interval with a two‐month replanning frequency provided the best MPS performance in terms of total cost.

Keywords

Citation

Nathan, J. and Venkataraman, R. (1998), "Determination of master production schedule replanning frequency for various forecast window intervals", International Journal of Operations & Production Management, Vol. 18 No. 8, pp. 767-777. https://doi.org/10.1108/01443579810217459

Publisher

:

MCB UP Ltd

Copyright © 1998, MCB UP Limited

Related articles