To read this content please select one of the options below:

A heuristic for sequencing PCBs with due‐dates

K. Raj Kumar (Indian Institute of Technology, Madras, India)
T.T. Narendran (Indian Institute of Technology, Madras, India)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 May 1997

566

Abstract

Addresses the problem of sequencing a set of PCBs on a single assembling machine. Considers two objectives, namely minimizing tardiness and minimizing the set‐ups. Reduces component change‐overs by exploiting the similarity between PCBs. Proposes a new measure to sequence the PCBs, taking care of both the objectives. Develops a heuristic for solving the bi‐criteria problem. The proposed method performs better than the existing heuristics for the comparable situation of sequencing in a single machine job‐shop.

Keywords

Citation

Raj Kumar, K. and Narendran, T.T. (1997), "A heuristic for sequencing PCBs with due‐dates", International Journal of Operations & Production Management, Vol. 17 No. 5, pp. 446-467. https://doi.org/10.1108/01443579710167195

Publisher

:

MCB UP Ltd

Copyright © 1997, MCB UP Limited

Related articles